Free tools. Some outbound links are referral or affiliate links, and every one is labelled. Methodology & terms
TiersovaOpen B2B SaaS TCO & CSV Schema Suite
Cloud & App Hosting

Heroku vs Railway / Render

Estimate what moving from Heroku to Railway / Render costs over 12 to 36 months, including the one-time switch. Then remap your exported CSV headers.

Illustrative estimate, edit the rates to match your quote

Why teams look at this switch: Elimination of free dynos & expensive scaling per dyno/database

Cost calculator

Unit rates

CSV header mapper

Rename exported Heroku column headers to suggested Railway / Render column names, for reporting or manual data preparation. Not an official Railway / Render import format. It runs in your browser; only headers change.

Renamed headers do not make a file import-ready. Compare the result with Railway / Render's import template and create any custom fields there first.

Heroku columnRailway / Render columnField type
HEROKU_POSTGRESQL_URIDATABASE_URLSuggested
PORTPORTSuggested
DYNO_RAM_MBRAILWAY_MEMORY_LIMITCustom field, create it first
REDIS_TLS_URLREDIS_URLSuggested
Open a .csv file

When moving to Railway / Render makes sense

  • Your main cost driver is Elimination of free dynos & expensive scaling per dyno/database, and your volume is past the break-even point above.
  • Your team can finish the CSV import and onboarding within the switching budget you entered.
  • You have checked that Railway / Render's plan covers the integrations and compliance rules you need.

When staying on Heroku is the better call

  • The one-time migration, re-integration or retraining cost is larger than 12 to 24 months of savings.
  • You are inside a multi-year Heroku contract with early-termination fees.
  • Your workflow relies on add-ons or features Railway / Render does not support yet.

How the result changes with volume

Twelve-month totals at half, default and double volume, using the default pricing model and a $150 switching cost.

Volume (Active Services / Dynos)HerokuRailway / Render12-month difference
50% volume (3)$90/mo$28/mo+$594
Default volume (6)$165/mo$50/mo+$1,230
200% volume (12)$315/mo$95/mo+$2,490

Questions

How is the total cost of Heroku and Railway / Render compared?

Each side's monthly cost is multiplied by the months in the horizon, and the one-time switching cost is added to Railway / Render. At the default volume (Active Services / Dynos: 6), the model gives about $165 per month for Heroku and $50 per month for Railway / Render.

How do Heroku CSV headers map to Railway / Render?

The mapper renames Heroku columns (HEROKU_POSTGRESQL_URI, PORT, DYNO_RAM_MB, REDIS_TLS_URL) to Railway / Render columns (DATABASE_URL, PORT, RAILWAY_MEMORY_LIMIT, REDIS_URL) in your browser. Custom fields must exist in Railway / Render before you import.

When should a company stay on Heroku?

Stay if the one-time switching, integration or contract-exit cost is larger than the savings over the horizon you care about. The calculator shows that case as a negative result.